Regional, Core Network Design/Planning /Vendors
Manager
MetroPCS, New York/Florida
Working as Regional Core Network
Design/Planning/Vendors Manager for New York/South Florida Region.
Responsible for Market Core Network built out and managing vendors.
Project Initiator for switch build-out, Project Time Line, Order Network
Transport and Negotiate Rates for Transport and MOU. T’1 ordering for
Switch/Cell Sites and MDN (Numbers) 1K/10K
•
Creating Electrical, Transport and Interconnect Project Plan &
Project Manage
•
Responsible for initiating/planning/implementation of projects.
•
Coordinate the activities of cross functional groups to complete the
projects that typically involve developing
project activity schedules, establishing sub-committee hierarchy,
monitoring progress, serving as a single point
of contact for problem resolution
•
Develop interdepartmental operations, administration and maintenance
methods and procedures, detailed work
plans, schedules, project estimates, resource plans, and status reports
•
Maintain a thorough knowledge of project and update upper management
• Working with Contracting Vendor on Power
Plant Install, Make sure Vendor is following Design
• Working with Vendor on ODD for New or Re-home
MSC
•
Submitted ASR, Order OC-192, OC-48, OC-12, OC-3 and T3/T1
•
Ordering PSAP based on Local Counties/Towns
• Traffic Analysis and Transport Network
Optimization.
•
Provision, maintaining circuit
assignment records
•
Grooming all the End Offices and Tandems to save on transport/trunking
•
Issue orders in case of blockage or
overflow to make sure network is properly size to carry the traffic
•
Detect trunk groups with unusual
utilization patterns to determine if trunks are out of service, calls are
in danger of being blocked, or routing is not properly configured work with
Data Translation to Fix the Problem A.S.A.P.
• Filing all the paper work to NeuStar (Number
Pooling Administration) and or also with NAPA for 1K, 10K or LRN etc
application
•
Taking care of all the Rate Centers in
Region, ordering MDN 1K or 10K Blocks
•
Make sure all the other required the
paper work also filled along the application to announce internally to
various dept.
• LERG update for NPA NXX, Switch/POI CLLI and
Tandem etc.
MSC turn up:
Based on RF Coverage map created
911,2A, 2B, LD, 411, 311, 800 and wireless/inter exchange service provider
plan.
order the SS7/trunks open the ISUP
Order the trunks, install
test/accept
Test the trunks based on NPA-NXX
tested for out/in-coming calls
Managing Vendors:
Selecting a vendor for job, based
on qualification/development/process/quality of
management/planning/scheduling, systems alignment/technology integration
and collaboration. Involve appropriate personnel, review the project
from company standpoint weekly, indentify agreement and disagreement, gaps
and evaluate cause by these gaps and develop action plans to remedy these
gaps. Created evolution metrics based on Delivery, Quality, Customers
Service and Pricing.
Delivery: on time, items, quantities, meets due date,
accurate documentation/identification provided, and response on
rush/emergency requirements.
Quality: Warranty coverage, reliability, meeting of
specifications including new features introductions,
documentation/instruction and technical manuals
Customer
Service: Market imminent,
invoicing efficiency, order acknowledgment, recognizes cost effects,
compliance to terms, technical emergency support, issuing credit memos
promptly, technical support/resolution, inside sales support/customers
service, training provided on products.
Pricing: Price stability/accuracy, competitive
pricing/value, advance notice of price change based on signed contact.
Dark
Fiber Project:
Create
the business case based on calculated T1/T3 and additional capacity needs
at each cell site and compare with Dark Fiber Cost based on 5/10/15 Years
Planning/Design
Dark Fiber Project with other Dep’t for over 270 Cell sites, 100 MB
Bandwidth.
13
Nodes on Dark Fiber Ring and assigned number of cell sites to each Node
based on location/distance.
Worked
with Installer and calculate OTDR Budget LOSS and Compare with Actual Test
Set reading Graph and if found LOSS more than or close Budget LOSS or Graph
has Peak rejects the fiber and asked them to fix the issue.
Schedule
Cut-over from T1 to Dark Fiber and after confirmation cut-over issue
disconnect T1.
CDMA/LTE/EVDO
Consolidation:
Worked
with corporate engineering team and local fields operation/RF/Fixed Network
dep’t came to agreement. Having T1s to each CDMA/LTE/EVDO is waste of
recourse.
Should
use SIU.
Created
the process and manage SIU-consolidated with various departments.
Created
Cisco 9K/10K Multilink and interface script
Created
SIU script, assigned IP Address based on corporate guideline
Start
running weekly utilization report on each SIU-consolidated Cell site and
found T1’s are under 50% utilized.
Before
SIU consolidation each tech type T1 was close to 100% utilized
Microwave
Project:
FAN-Nodes
are installed within timeframe
If
microwave link turn-up get all the test results and compare with calculated
db loss
Make
sure the link db loss is within the contract, if not reject the link and
let them re-configure
If
cell site cut-over to microwave then asked Fixed Network Dep’t to
disconnect T1’s.
|